RCI offers staff that are experienced and professional.
Our project history includes a numerous design-build and general construction contracts. RCI owners and project managers have backgrounds that include hundreds of Federal construction projects and design-build contracts (both public & private), worth over a combined $200 million. RCI principals have won, mobilized and/or managed numerous successful IDIQ/JOC/SABER contracts, including, Camp Pendleton, Veterans Affairs Los Angeles, Vandenberg AFB and others.
RCI has met every contract cost, schedule and performance requirement since inception. Our personnel are known for their timeliness, quality and professionalism. RCI has a perfect safety record; not one accident or injury in its history. We strive for Best Value on every contract. Our staff is skilled in providing design alternatives that provide a better product for the dollar.
RCI offers staff that includes a registered P.E. (civil), licensed general contractors and electricians, construction managers, business professionals, and skilled tradesmen, experienced in all areas of construction and contract types. We have a full complement of qualified sub-contractors to augment our in-house capabilities, enabling us to meet all contract requirements.
Roofing / HVAC
Plumbing
HVAC
HVAC
HVAC
Roofing
Roofing
Roofing
Electrical
Roofing
Plumbing
Electrical
Fire Suppresion
8(a)
WOSB
EDWOSB
RCI met and exceeded all of their contractually mandated quality requirements. They provided a high quality product and not only fulfilled their contract, they provided a much better product than they were required to provide. RCI exceeded all of the requirements set in the contract.
RCI provided the government with material and workmanship that exceeded the users requirements. The contractor diligently worked with the user to verify that all of their requirements were being met. RCI's quality control manager ensured that the government received a better end product than what was required in the contract. RCI identified several discrepancies with the design drawings and made appropriate changes to their work effort to provide the government obtained a quality product without requiring a change to the contract. They completed ahead of schedule and surpassed all expectations.